The Winkler CAD contractor plan explains why cost is generally not employed, a rigorous market approach is rare, and income is predominantly relied upon.
The Winkler CAD contractor plan describes a qualified sequence from one producing lease to interest-type full value and then fractional-owner proration.
The Winkler CAD contractor plan distinguishes receiving a mineral report from being identified as an intended user and limits the section to Pritchard & Abbott work.
The Ward CAD 2025-2026 reappraisal plan has one district mineral section and a second contractor section in Appendix B, each with a different printed page range.
Ward CAD defines Mineral Property for one 2026-2029 appraisal-services contract, lists related interests, excludes specified non-fuel materials, and keeps Personal Property separate.
The Ward CAD 2026 mineral ZIP has seven entries on three calendar dates, but its member numbers and timestamp fields do not establish publication chronology.
The Ward and Loving CAD 2026 archives contain a byte-identical layout PDF, but their publisher pages and outer archives remain separate evidence lanes.
Read Upton CAD’s local policy and current Texas OAG guidance as separate layers, then preserve every request, response, clarification, and charge discrepancy.
Treat Upton CAD’s TXT and CSV members as separate source objects, preserve exact bytes, and stop before owner-row inspection or unsupported schema conclusions.
Separate field-specific rows from standard fallback rows, preserve dates and source labels, and verify current applicability outside the historical export.
Read RRC field class and field-type rows in their exact source context, then resolve an associated field number without turning the pointer into property evidence.
A CAD account number, API number, RRC lease or gas-well ID, district, and P-5 operator number identify different record objects and should not share one field.
Reeves appears in the official 2025 MAP list, not the 2025 appraisal-district ratio-study list; the official 2024 findings retain the Reeves worksheet route.
The Reeves CAD 2024 ratio-study summary displays 66 Category G ratios and six adjacent aggregate fields that must remain inside their official district-study context.
The Reeves County 2025 preliminary PVS routes to two separate ISD summaries whose Category G rows must remain attached to their districts and public-study purpose.