Texas Mineral Rights archive
Page 3 of 9 · Texas Mineral Rights
The full texas mineral rights archive across 107 reviewed articles. Use the pagination below to move between pages; the canonical hub at /mineral-rights/texas/ returns to topic-organized browsing.
Page 3 of 9
Reviewed texas mineral rights articles
Showing 25 through 36 of 107 published articles
-
Why Reeves CAD Has No 2025 Ratio-Study Worksheet
Reeves appears in the official 2025 MAP list, not the 2025 appraisal-district ratio-study list; the official 2024 findings retain the Reeves worksheet route.
-
Reeves CAD 2024 Ratio Study: 66 Category G Ratios
The Reeves CAD 2024 ratio-study summary displays 66 Category G ratios and six adjacent aggregate fields that must remain inside their official district-study context.
-
Reeves County 2025 Preliminary PVS: Two Category G Totals
The Reeves County 2025 preliminary PVS routes to two separate ISD summaries whose Category G rows must remain attached to their districts and public-study purpose.
-
Reeves CAD 2025 MAP Review: Four Passes and Two Recommendations
The Reeves CAD 2025 final MAP report separates four mandatory results, four review-area scores, and two recommendations from any property-specific conclusion.
-
Reeves County 2024 Category G Worksheets: Two ISDs, Strata, and Ratios
The Reeves County 2024 final-findings route separates Category G worksheets by school district, then separates property rows, G1 strata, stratum totals, and category totals inside each worksheet.
-
Pecos CAD Pipeline Appraisal Models: RCNLD, Unit Value, and Land
Pecos CAD's plan describes a pipeline RCNLD baseline, a conditional whole-system unit-value route, component allocation, and separate land treatment.
-
Pecos CAD Industrial Appraisal Limits: Title, Inspection, and Sketches
Pecos CAD's plan states assumptions and limits for industrial appraisals, including title, inspection, sketch, purpose, and hidden-condition boundaries.
-
Pecos CAD Oil and Gas Review: Infrequent Sales and Multi-Site Limits
Pecos CAD’s plan describes annual oil-and-gas appraisal review and explains why infrequent, nonpublic, bundled sales can limit appraisal-to-sales analysis.
-
Pecos CAD Oil and Gas Property Discovery: RRCID, Permit, and January 1
The Pecos plan describes an RRCID-to-permit discovery sequence and three January 1 tests, but those statements do not establish a current property result.
-
Pecos CAD 2025-2026 Reappraisal Plan: Category G Parcel Counts by ISD
The plan prints separate Category G parcel estimates for 2025 Buena Vista ISD and 2026 Fort Stockton ISD, not a county total or owner-level result.
-
Midland CAD 2025-2026 Mineral Work Calendar: January 1 Snapshot to July Certification
The plan prints mineral valuation from January through May, but its January 1 effective date and later workflow are document statements, not proof of an owner-level result.
-
Midland CAD 2026 Appraisal Services RFP: Mineral Scope and Date-Control Crosswalk
The official RFP prints different proposal dates on physical pages 4, 8, and 22. Preserve each string, treat the conflict as unresolved, and verify current instructions with Midland CAD.